Plant Safety Upgrades in Texas
CREWpoint Contractors designed, fabricated and installed safety guards on existing equipment that posed risks to extremities and eyes. These
Safety Upgrades and Equipment Installation at Pennsylvania Water Bottling Plant
CREWpoint Contractors was responsible for making significant safety upgrades and equipment replacements at a Pennsylvania Water Bottling plant
Texas Landfill Methane Gas Processing Plant Upgrades Completed
CREWpoint Contractors completed this challenging job in a harsh environment under a very tight timetable. Furthermore, the job’s scope and
Upgrades Completed on Commercial Bakery Wastewater System
CREWpoint Contractors performed an extensive upgrade to the wastewater system in a large commercial bakery located in Texas. The scope of work
CREWpoint Contractors Assists Global Manufacturer of Wire and Cable Products Perform Safety Audits
CREWpoint Contractors identified potential hazards and “pinch points” in the manufacturing process. CREWpoint designed a universal solution to
CREWpoint Contractors Completes Major Upgrades for Major U.S. Water Bottler
CREWpoint Contractors recently completed major upgrades to multiple facilities of a major U.S. water bottler. Traveling throughout the country,
CREWpoint Contractors Teams with Kohler to Bring New Sustainable Ceramic Aggregate Product to Market
Using ceramic aggregate, a waste product from pottery not sent to market, CREWpoint identified a unique use of the Kohler material as